Saltbox, Bognor Regis

The new Saltbox facility includes over 6,000 sq ft of display space spread across three showroom areas, alongside a 6,500 sq ft workshop featuring eleven bays. Challenge To create a brand new facility The proposed new solar trees are designed to power the electric car charging stations within the Southampton quarters as well as easing […]

Hendy Showroom & Workshop, Eastleigh

Calcinotto were appointed to this multi-branded car showroom and service/MOT workshop on the outskirts of Eastleigh, Hampshire for the Hendy Group Dealership. Challenge Reshaping Sustainability Basics The challenge was to reuse a site housing civic office and transform it into a car showroom, whilst sticking to sustainable and practical building methods. This brought the new […]

JLR Showroom, Christchurch

Working with the design team, we were able to retain over 50% of the original steel frame and 80% of the original foundations without additional strengthening works. Challenge Reflecting the brand with the architecture The task set to Calcinotto was to reuse as much of the original showroom structure for the new development. The modern […]

JLR Aftersales, Christchurch

This new aftersales facility has used the JLR branding incorporated into the design by SRA Architects, and was opened in 2018. Challenge Using the original frame to reintroduce concepts  To create the largest JLR aftersales facility in the UK (other than Jaguar Land Rover’s own operation in Coventry). As well as this, to build on […]

ABP Multidecks

ABP Multidecks was designed in mind of the lack of commercial car parks around the Port of Southampton Challenge Combining functionality with aesthetic appeal In 2017, Calcinotto was appointed as the lead consultant to provide structural and civil services for contracts worth a combined total of £24.5 million. This entailed delivering two multi-level car storage […]