Saltbox, Bognor Regis

The new Saltbox facility includes over 6,000 sq ft of display space spread across three showroom areas, alongside a 6,500 sq ft workshop featuring eleven bays. Challenge To create a brand new facility The proposed new solar trees are designed to power the electric car charging stations within the Southampton quarters as well as easing […]

Mill Lane, Alton

Mill Lane, in Alton (Hampshire) is a retail park anchored by two main tenants, Lidl and Home Bargains.  Challenge Managing and overcoming tough conditions  Calcinotto successfully assisted the Main Contractor, Knights Brown, in their production of a tender submission for the design and construction of a new retail park in Alton, Hampshire. The client, Hargreaves, […]

Hendy Showroom & Workshop, Eastleigh

Calcinotto were appointed to this multi-branded car showroom and service/MOT workshop on the outskirts of Eastleigh, Hampshire for the Hendy Group Dealership. Challenge Reshaping Sustainability Basics The challenge was to reuse a site housing civic office and transform it into a car showroom, whilst sticking to sustainable and practical building methods. This brought the new […]

Heatric, Poole

Calcinotto has a long-standing relationship with the Heatric dating back to 2006. On this project, Calcinotto provided Civil & Structural Engineering services for a new manufacturing facility with 3 storey office block and at the time, the largest dedicated radiographic cell in Europe. Challenge Planning construction and access The main manufacturing facility was a 3 […]

Harbour View, Dorset

A new contemporary non-denominational chapel is set within the grounds of Harbour View Woodland Burial Ground in Lytchett Minster, near Poole, Dorset. Challenge Merging luxury with environmental responsibility The design of the new building draws reference from the traditional use of burial mounds commonly seen in the area. The crematorium nestles within a curving landscaped […]

Link Park, Weymouth

Link Park has been constructed with the infrastructure required to connect to Weymouth’s superfast broadband.  It also boasts plentiful parking, a landscaped seating area and the benefit of low cost, green electricity generated from rooftop PV panels. Challenge Using the space efficiently Calcinotto was employed as the Structural and Civil Engineers at the Link Park […]

Embankment Way, Ringwood

Embankment Way was our fifth project with Hoburne Developments, establishing a successful partnership. Challenge Redefining commercial space To design a 21-unit light industrial/commercial business park in Ringwood, incorporating new vehicular accesses from Embankment Way, hard landscaping and car parking together with associated aisles and footpaths. Solution Blending industrial scenes into the surroundings  The site is […]

RFU Centre

Situated within the grounds of Pennyhill Park Hotel, this project involved the construction of a new 29,000 square foot training centre, which encompassed a state-of-the-art 3G indoor pitch, a professional gymnasium, and well-appointed changing rooms and showers. Challenge Minimising disruption whilst creating waves Built adjacent to an existing training pitch within the premises of the […]

JLR Showroom, Christchurch

Working with the design team, we were able to retain over 50% of the original steel frame and 80% of the original foundations without additional strengthening works. Challenge Reflecting the brand with the architecture The task set to Calcinotto was to reuse as much of the original showroom structure for the new development. The modern […]

JLR Aftersales, Christchurch

This new aftersales facility has used the JLR branding incorporated into the design by SRA Architects, and was opened in 2018. Challenge Using the original frame to reintroduce concepts  To create the largest JLR aftersales facility in the UK (other than Jaguar Land Rover’s own operation in Coventry). As well as this, to build on […]